Opex Omation Envelopener 210 Series Operator's Manual page 55

Hide thumbs Also See for Omation Envelopener 210 Series:
Table of Contents

Advertisement

3. To deepen the cut, begin by turning the cutter depth screw 1/4 turn the right
using a Phillips screwdriver (Figure 4-18).
4. Replace the cover and run an envelope through to verify if it has been cut
now.
5. Repeat steps 3 and 4 until the envelopes are being cut open. If you find the
cut is too deep, turn the screw to the left in 1/4 turn or smaller increments
until you have the envelope being cut without cutting the contents.
Operation
Omation Series 210™ Envelopener® Operator Manual
Turn right in 1/4 turn
increments for a deeper cut
Figure 4-18: Adjusting the cutter depth
OPEX Corporation
55

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Related Products for Opex Omation Envelopener 210 Series

This manual is also suitable for:

Omation envelopener om210Envelopener omation 210 seriesEnvelopener om210

Table of Contents