Verifying The Connection - SolarEdge Dry-Contact switch Installation Manual

Table of Contents

Advertisement

Verifying the Connection

You can re-configure the device operation mode and schedules at any time:
To
Manually turn the load on or off
Modify the schedule configuration
Disable or delete a schedule
Disconnect the device(s) from the network
Verifying the Connection
1. Check the status screens:
HA devices status, showing the device name and state: ON, OFF, or an asterisk (*), which indicates
l
no communication with the device:
H A
S E - S - P L G
Communication status, showing the number of communicating HA devices (under Prot) and the
l
number of detected devices (under ##):
w w w w w
R S 4 8 5 - 1
Z i g B e e
2. To check the device details, from the device configuration screen, select Device Info. The following
screen is displayed:
M A C :
L a s t
M F G :
M o d e l :
P o w e r
MAC: the full MAC address of the device
l
Last seen: The date and time when the device communicated with the inverter
l
MFG: The device manufacturer
l
Model: The device model type
l
Power [W]: The energy delivered to the load
l
8
D e v i c e s
S t a t e :
0 1 1
< O N >
D e v     P r o t
< - - - > < - - > < - >
< H A >
<
x x x x x x x x x x x
s e e n : < D D : H H >
S o l a r E d g e
S E - S - P L G
[ W ] :
0
Select the device from the Device Manager screen. Select
Mode è Manual and set the device to either ON or OFF.
Select the device from the Device Manager screen. Select
Mode è Auto and set the parameters of any menu: Smart
Save/Schedule.
Select Disable or Delete from the Schedule screen.
Select Remove Device or Remove All from the device
screen.
# #
1 > < 1 >
SolarEdge Dry-Contact switch Installation Guide
Do this

Advertisement

Table of Contents
loading

Table of Contents