Download Print this page

Emerson InSinkErator Grind2Energy Service Manual page 5

Organics recycling system

Advertisement

System
Components
Information on this page
and subsequent pages show
the system dimensions and
system components. It also
calls out the required service
test equipment and tools
you will need to perform
proper maintenance on the
Grind2Energy system.
Tools Needed for
Service
Digital volt meter
Phillips and flathead
screwdrivers
Wire strippers
Adjustable wrench
Large pipe wrench
5/8" Hex key
Socket wrenches up to 1"
11 mm open end wrench
Thread sealing tape
Torque wrench
Strap wrench
(5-1/2" diameter min.)
5 gallon bucket
grind2energy.com
Top View
Front View
GRINDING
208-230V/35A
SYSTEM*
460V/20A
COLD WATER*
TANK
FULL
WARNING
Tools & Materials,
Installation Requirements
68–1/4" (174 cm)
MINIMUM
36" MIN. CLEARANCE BETWEEN TABLE AND
WALL OR OTHER OBJECTS
WATER WITHIN
12" TO TABLE
START
STOP
START
STOP
ELECTRICAL SHOCK HAZARD. DISCONNECT INCOMING POWER BEFORE
SERVICING CONTROL CENTER. FAILURE TO DO SO COULD RESULT IN
DEATH OR SERIOUS PERSONAL INJURY. DOOR INTERLOCK SWITCHED
DISCONNECT CONTROL CIRCUIT ONLY.
Grind2Energy Technical Support: 844-874-7529
30"
(77 cm)
36"
(91.5 cm)
| 3
G2E015-15F-89-84

Advertisement

loading

This manual is also suitable for:

Gd-1Gc-1Gc-2