Download Print this page

Emerson InSinkErator Grind2Energy Service Manual page 17

Organics recycling system

Advertisement

Overload Protector
Testing Overload Protector
SHOCK HAZARD!
WARNING
Turn off electrical power at circuit
breaker, use voltmeter or circuit tester to ensure that
POWER IS OFF.
1. Remove screw and terminal box (figure 23).
2. Remove two screws, securing overload protector to
bracket and pull out from unit. Disconnect overload wires
from stator.
3. Push red button in and check continuity between all
terminals and center post using an ohmmeter (figure 24).
6 terminals – 3 Ø
4. Check for continuity between all terminals and center
post. Replace overload protector if circuit is open on any
terminal/center post combination.
5. Re-install terminal box in reverse order.
Replacing Overload Protector
1. Remove screw and terminal box (figure 24).
2. Disconnect wires.
3. Remove two screws securing overload protector to
bracket, disconnect wires and remove protector.
4. Connect new switch wires and tuck wires into bracket
and secure new protector to bracket using two screws.
5. Re-install terminal box and screw.
grind2energy.com
Overload
Protector
Screw
Screw
Terminal Box
figure 23. Terminal Box and Components
6
Terminal
5
4
Center post
figure 24. Testing Overload Protector
figure 24. Testing Overload Protector
Grind2Energy Technical Support: 844-874-7529
Overload Protector
Mounting
Bracket
Grounding
Screw
1
2
3
(3 Ø shown)
| 15
G2E015-15F-89-84

Advertisement

loading

This manual is also suitable for:

Gd-1Gc-1Gc-2