Download Print this page

Emerson InSinkErator Grind2Energy Service Manual page 10

Organics recycling system

Advertisement

WARNING
SHOCK HAZARD! Turn off
electrical power at circuit breaker,
use voltmeter or circuit tester to
ensure that POWER IS OFF.
DC
ok
DC ok
2 2 2 4 4 4 7 10 11 12 15 M1 M2 M3 T1 T2 T3
Adjust
Power Supply
INPUT
N
N
6
2 GPM
5 GPM
SOLENOID
SOLENOID
grind2energy.com
Wiring Connections
Incoming power supply requires that:
Ground wire is securely fastened to
panel as shown.
208-230V system use #8 AWG wire
from line disconnect switch and control
box.
460V system use #12 AWG wire from
line disconnect switch to control box.
L1
L2
L3
1 ON
L1
L2
L3
Control Box
2 2 2 4 4 4 7 10 11 12 15 M1 M2 M3 T1 T2 T3
5
4
FLOAT
PRESSURE
SWITCH
DC ok
Adjust
Power Supply
INPUT
N
3
2
GRINDER
SWITCH
Grind2Energy Technical Support: 844-874-7529
Grind2Energy
Wiring Connections
The pump lead wires are connected to
1
"T1, T2 & T3" as shown below.
The grinder lead wires are connected
2
to "M1, M2 & M3" as shown below.
The pressure switch leads are con-
3
nected to the control panel as shown
below (black to black, brown to brown,
blue to blue).
The lead wire for the tank float switch
4
is connected to terminal connections 2
and 15 as shown below. This wire runs
along the length of the discharge line
to the tank.
The 5gpm solenoid valve lead wires
5
are connected to terminal 11 & 12 as
shown below.
The 2gpm solenoid valve lead wires are
6
connected to terminal 7 & 10 as shown
below.
DC
ok
L1
L2
L3
1 ON
L1
L2
L3
N
17
1
INCOMING
PUMP
POWER
G2E015-15F-89-84
System
| 8

Advertisement

loading

This manual is also suitable for:

Gd-1Gc-1Gc-2