Fasten the brazed set to the bracket using the plastic clamp (C) [Key 10 mm] – see Figure 5.
5.
The plastic clamp can be placed in two different positions (Figures 5 & 6) because the partition wall is available
in two different versions, with the holes located in different positions.
Figure 5
6.
Connect the high-pressure hose with the Schraeder port on the shut-off valve of the liquid receiver as per
Figure 7. Use the copper seal (F).
The high-pressure hose must be placed freely so that the Schraeder connection is not strained. The Schraeder
connection must be tightened to a torque of 16 to 18 Nm. Do not exceed 20 Nm in any case [Key 14 mm].
Figure 7
RGL_Unit_CO2_PT5/E/Rev00
Figure 6