Download Print this page

Matan Barak Series Technical Note page 7

Installing the linear encoder (3 m and 5 m printers)

Advertisement

Sticking the magnetic scale
13. You must now secure the M
two C
At the right end of the B
then insert the C
14. Apply one or two drops of Loctite #222 onto the conical screw's thread and
tighten the screw, through the C
Clamp
Magnetic Scale
Beam
15. Secure the left end of the S
secured the right side.
10100139 - C
.
LAMPS
EAM
into the same slot, above the T-nut.
LAMP
Carriage Belt
© Matan Digital Printers Ltd.
Removing the sticky protective tape
S
to the B
AGNETIC
CALE
, insert the T-nut into the B
, into the T-nut, as shown below.
LAMP
Con Screw M6 x 16
The right end of the Beam
to the B
, in the same way that you
CALE
EAM
. This is done using the
EAM
's groove, and
EAM
T-nut (under the Clamp)
Page 7 of 13

Advertisement

loading

Related Products for Matan Barak Series