Operating Elements - Baur PGK 25 Operating Instructions Manual

High voltage testing set
Table of Contents

Advertisement

1. Operating Elements

13
1
2
1
Push-button switch for battery test
2
Selector switch 0 - 5 kV or 0 - 25 kV
3
Voltage regulator with 0-locking
4
Range selector switch for current indication
5
Operating switch with timer and discharge unit
6
High voltage output with controlling contact
7
Connector for protective earth cable
8
Mains connector with power selector and fuses
9
Connectors for external battery (12 V)
10
Connector for current range plotter
11
H.V. control lamp
12
µA - meter
13
kV - meter with indication for battery test
Option: Guard connection
14
Operating mode switch for current measurement
15
Terminal for current measurement
12
10
11
3
4
5 14 15 6
1. Operating Elements
9
8
7
1-1

Advertisement

Table of Contents
loading

Table of Contents