Homa AL3 Original Instruction Manual page 14

Electronic alarm
Table of Contents

Advertisement

Available languages

Available languages

AL3 with tank float:
Before installing the float, please pull the mains plug of
35
the pumping station / cubicle. Drill a hole (22mm Ø) with
Ø22
a suitable drill on the upper edge on the side of the tank.
The corresponding drilling position for your tank model
can be found in the following drawings. (San.iQ plus: Use
the provided core tips)
Saniflux V / Sanifox / TSUB / TSWC
35
35
Ø22
Ø22
For Saniflux V, the installation of the float is only pos-
sible on the side on which the pressure connection is
also located.
San.iQ cut & San.iQ one
25
Ø22
San.iQ cut V
250
14 | EngliSH
25
Ø22
Ø22
35
Ø22
25
Ø22
Ø22
Ø22
Ø22
Ø22
Ø22
Ø22
Saniquick C
25
25
San.iQ plus standard
Ø22
San.iQ plus with special float for operation with a
shower (low switching point)
95
Sanipower
35
Ø22
Ø22
Ø22
95
Ø22
Ø22
Ø22
Ø22
Ø22
95
Ø22
Ø22
Ø22

Advertisement

Table of Contents
loading

Table of Contents