Pin Definition; Development Board Open-Box Testing; Packing List; Open-Box Testing - Ebyte E73-TBA User Manual

Nrf52810/nrf52832 test suite
Table of Contents

Advertisement

Chengdu Ebyte Electronic Technology Co.,Ltd.

1.4.4. Pin Definition

1.5. Development Board Open-Box Testing

1.5.1. Packing List

E73-TBX test board x 1(E73-TBA/E73-TBB called E73-TBX)
MICRO USB cable x 1

1.5.2. Open-Box Testing

When received the packet, please check whether all parts are include. When shipped, the development board burns
bluetooth transparent transmission program already. The below testing method is to ensure whether the board is well or not
via the data transmission function between PC serial port and APP.
1) Install the serial port assistant in the computer and install
and find the icon of "UART" as below:
Copyright ©2012–2019,Chengdu Ebyte Electronic Technology Co.,Ltd.
nRF Toolbox in Phone. Run the nRF Toolbox in phone,
E73-TBX User Manual
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

E73-tbb

Table of Contents