Reader Project Report; Time Codes - Westinghouse SE 6000 Product Manual

Westinghouse se 6000 security management system standard product manual
Table of Contents

Advertisement

5-10
R
P
R
EADER
ROJECT
EPORT
The Reader Project Report lists project number, description, readers assigned, current status.
N
OTE
This report gives reader project status based on start / stop dates defined by the project entry
function compared to the current system date and time. Since the selection criteria and reported
status do not consider operator overrides, actual and reported project status may differ.
A sample reader project report screen follows:
R
P
R
EADER
ROJECT
EPORT
05/05/96
13:42
Project
Project Description
_______
____________________________________ ________
10
TEST PROJECT #1
15
EMERG. CIRCUIT BOARD REV. PROJECT

TIME CODES

This report lists all time codes set up in the database. A sample screen follows:
— S
R
AMPLE
EPORT
Security Electronics
Project / Reader Report
Schedule
Active
Active
S
5: M
F
ECTION
ASTER
ILE
Reader
Reader Description
______
_____________________
8110
808SX DOOR 1
8120
808SX DOOR 2
1001
422 ENTRY #1
1010
818 #7 DOOR #1 ALPHA
R
EPORTS
Page
1

Advertisement

Table of Contents
loading

Table of Contents