Tests Before Commissioning; Filling In Fuel - Bomag BT 50 Operating Instructions, Maintenance Instructions

Table of Contents

Advertisement

Operation

3.1 Tests before commissioning

During the running-in period the engine idling
speed may be higher than normal, because of the
good movability of the engine parts
In this case read just the idling speed on the
carburettor, refer to the respective chapter.
The running-in period for the vibratory tamper is
10 operating hours.
Check
Condition of engine and machine
Fuel tank and fuel lines for leaks
Fuel level
Bellows for damage and leaks
Oil filling in the tamper cylinder
Visual inspection of the machine
10

3.2 Filling in fuel

Fire hazard!
Only fill in fuel with the engine shut down and
the fuel valve closed. Do not spill any fuel!
Do not inhale any fuel fumes.
No fire, do not smoke!
Mixing ratio with two-stroke engine oil 50:1
Fig. 1
Fuel:
Unleaded standard grade gasoline (Fig. 1).
Oil:
Use only two-stroke engine oil, whereby the oil
may also have self-mixing abilities. Unsuitable oil
causes premature oil carbon deposits in the outlet
manifold of the engine.
BOMAG
BT 50 / BT 60 / BT 65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bt 60Bt 65Bt 70

Table of Contents