Installation Procedure - LG MULTI F A2UW16GFA0 Engineering Product Data Book

Hide thumbs Also See for MULTI F A2UW16GFA0:
Table of Contents

Advertisement

1. General installation guideline
1.2 Checking the drawing

Installation procedure

Determination of work scope
Preparation of contract drawings
Sleeve and insert works
Installation of indoor units
Refrigerant piping works
Drain pipe works
Duct works
Insulation works
Electrical work
Outdoor unit foundation works
Installation of outdoor units
Air tight test
Vacuum drying
Additional charge of refrigerant
Fit decoration panels
Test run
Transfer to customer with explanation
Remarks
Check and confirm required loads calculation,
model selection, drawings etc.
Make a relationship between outdoor ,indoor
controller and option connection clear.
(prepare control circuit diagram)
Determine sleeve position, size and
counts as required
Check model name to make sure the fitting is
made correctly
Special attention to dryness , cleanness and
tightness
Make sure that the drain pipe diameter is
big enough and adjust it to downward gradient
Make sure airflow is sufficient
Make sure no gap is left where the
insulating materials are joined
Multiple core cable must not be used
(suitable cable should be selected)
The foundation must be vibration proof and
in level
Avoid airflow short circuit and ensure
sufficient space is allowed for servicing
For 24 hours at 3.8MPa(R410a) or 2.8MPa(R22)
there must be no drop in pressure
Less than 5 Torr (At least more than 1hr)
Charge the refrigerant accurately by using a
charging cylinder
Make sure there are no gaps left between
facing materials used on the ceiling
Follow the testing operation check sheet
Explain to customer or operator the manual
etc
Heat pump
_ 2
60Hz/R410A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi f a3uw21gfa0Multi f a5uw30gfa0Multi f a5uw40gfa0

Table of Contents