Page 1
Wall Hung & Floor Standing INSTRUCTION MANUAL Important! 1. When you receive your Newline Vanity package please check for any freight damage. 2. If damage has occurred, advise your supplier within 8 hours. 3. Do not install any faulty product as this will invalidate later claims.
Page 2
VENTA HANDLE VANITY INSTALLATION PLEASE READ CAREFULLY! WARRANTY 1. This covers faulty product. Check www.newline.co.nz for full details of warranty. 2. Any breakage on site will not be covered. 3. The installation must conform to these instructions for the warranty to apply.
Page 3
WALL HUNG VANITY INSTALLATION Mark the height (from 800mm to 900mm - owners choice) and locate top and bottom frame points to secure the unit. FASTENING TO THE WALL: A wall hung vanity needs solid fixing for attachment to the wall.
Page 4
FLOOR STANDING VANITY INSTALLATION Check the walls and floors are plumb, level and flat. Take remedial action or compensate for existing discrepancies in the installation process. Locate the necessary framework in the wall to fasten the cabinet securely. For installation of pipes it is easier to remove the doors and the drawers. Store them carefully and number their locations (drawer removal and reinstall, page 5).
Page 5
Then reposition lugs into draw body. Note: if drawer stops short of closing, this is due to the “soft close” mechanism needing reactivation. Push the drawer shut gently until it clicks. The soft close should now be fully active. FOR SPECIFICATIONS PLEASE GO TO NEWLINE.CO.NZ...
Page 6
This is by no means comprehensive but indicative of chemical harm that must be avoided. For further details please refer to the warranty details, available at www.newline.co.nz 3 Hynds Road, Greerton, Tauranga 3112 E: info@newline.co.nz P: 0508 639 5463 | 09 444 2053 www.newline.co.nz...