Adam AE 403 Series Service Manual page 28

Table of Contents

Advertisement

11.4
Fit the 4 screws to hold the transformer to the rear cover, then solder the
transformer cable on the PCB, once the cable is soldered, you may add hot glue to the
PCB pads and connection.
11.5
Adjust the length of the transformer mains cable inside the indicator, and then
tighten the locking nut, to secure the cable and seal the opening, in order to prevent any
liquids from entering inside the indicator's case.
11.6
As described in section 7.2.9, fit the rear cover. Then install the appropriate power
plug to the transformer's mains cable, which completes the transformer replacement.
Below you can see a picture of a finished Euro mains power plug.
© Adam Equipment Company 2019
Remember to secure
the
case
connector
while
tightening
the
cable locking nut
Fit the locking nut and screw it tight.
Ensure the locking nut is tight
enough to secure the cable and
make a good seal, to prevent liquids
do enter the case

Advertisement

Table of Contents
loading

Table of Contents