Installing The Density Determination Set - KERN YDB-04 Operating And Installation Instructions

For emb / emb-v
Table of Contents

Advertisement

3.1.2 Installing the density determination set

 Insert hook into one of the two holes.
 Place the platform for support of the glass beaker.
 Arrange a beaker glass (not included in the scope of delivery)
 Bring liquid and instruments to the right temperature until you achieve a constant
temperature. Observe the warm-up time of the balance.
6
YDB-04-BA_IA-e-1910

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tydb-04-a

Table of Contents