Commissioning; Installation; How To Prepare The Weighing Balance - KERN YDB-04 Operating And Installation Instructions

For emb / emb-v
Table of Contents

Advertisement

3 Commissioning

Compatible models:
 KERN EMB (only models with weighing plate Ø 82mm)
KERN EMB 200-3V

3.1 Installation

3.1.1 Prepare the weighing balance
• If necessary, carry out necessary adjustment before installation of the density
set.
• Correct adjustment is no longer possible after the density kit has been
installed.
• For reasons of adjustment, take away the density set and place the standard
weighing plate.
 Disconnect scale from power supply.
 Remove standard weighing plate.
YDB-04-BA_IA-e-1910
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tydb-04-a

Table of Contents