Mitsubishi Electric MSZ-LN-VG Series Service Manual page 130

Outdoor unit hfc utilized r32
Table of Contents

Advertisement

OPERATING PROCEDURE
5. Removing the expansion valve
(1) Remove the service panel (Photo 1).
(2) Remove the top panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the electrical parts for removing LEV R (Photo 4, 8).
(4) Remove the LEV coils.
(5) Detach the brazed parts of expansion valves and pipes.
© Copyright 2018 MITSUBISHI ELECTRIC CORPORATION
Issued: Nov. 2019. No.OBH790 REVISED EDITION-D
Issued: May 2019. No.OBH790 REVISED EDITION-C
Issued: Feb. 2019. No.OBH790 REVISED EDITION-B
Issued: Sep. 2018. No.OBH790 REVISED EDITION-A
Published: Mar. 2018. No.OBH790
Made in Japan
HEAD OFFICE: TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
Photo 11
R.V. coil
Photo 12
LEV coils
Specifications are subject to change without notice.
130
PHOTOS
4-way valve
Brazed parts
Expansion
valves

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents