Arch (3-1/2" and 5"), Tire, Bi-Pod, Tri-Pod (8' and 10' Height), Single 5" Post
USER GROUP: 2 - 12
RECOMMENDED CREW: At least 2 people
TOOLS REQUIRED:
1/4" allen head tool
Level
Tape measure
Auger / Post hole digger / Shovel
High speed 3/8" electric drill w/clutch
NOTE: Use of any other driver may result in damage to tool and/or hardware!
INSTALLATION TIME: Varies
CONCRETE REQUIRED:
NOTE: Concrete must have a minimum rating of 2,500 psi and must be mixed per
manufacturer's recommendations.
PRE-INSTALLATION CHECK:
Compare all items received to the packing list. Notify your local sales representative immediately if any
parts are missing or damaged.
We are not responsible for items discovered missing or damaged
Before beginning installation, make sure that you have read and understand the Installation Introduction
manual that was supplied to you. If you did not receive a copy, or if you have a question regarding anything
covered in this manual, contact your local sales representative.
SWING FRAMES
DATE: 08/29/2014
SWING FRAMES
3.53 cubic feet per hole (arch frames)
5.29 cubic feet per hole (single post frames)
7 cubic feet per hole (bi-pod and tri-pod frames)
NOTE: Swing chains and seats are sold separately.
after 72 hours from time of delivery!
Page 1 of 20
INSTALLATION GUIDELINES

Advertisement

loading

Summary of Contents for Park Central Arch

  • Page 1 INSTALLATION GUIDELINES SWING FRAMES Arch (3-1/2” and 5”), Tire, Bi-Pod, Tri-Pod (8’ and 10’ Height), Single 5” Post USER GROUP: 2 - 12 RECOMMENDED CREW: At least 2 people TOOLS REQUIRED: 1/4” allen head tool Level Tape measure Auger / Post hole digger / Shovel High speed 3/8”...
  • Page 2 INSTALLATION GUIDELINES ARCH SWING FRAME / TIRE SWING FRAME STEP 1 Refer to PLAN VIEW and FOOTING LAYOUT to locate swing frame. STEP 2 Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in the bottom of each hole.
  • Page 3 92-5/8” from center of vertical post. Attach SH-51 to top bar of swing frame by inserting bolts down through swivel halves. Secure bottom using provided nuts (see Detail B). Repeat for other SH-51. Detail B SH-51 FOOTING ELEVATION - ARCH SWING FRAME OR TIRE SWING FRAME SWING FRAMES Page 3 of 20 DATE: 08/29/2014...
  • Page 4 INSTALLATION GUIDELINES FOOTING LAYOUT - 3.5” ARCH FRAME - ONE BAY FOOTING LAYOUT - 3.5” ARCH FRAME - TWO BAY FOOTING LAYOUT - 3.5” ARCH FRAME - THREE BAY FOOTING LAYOUT - 3.5” ARCH FRAME - FOUR BAY SWING FRAMES...
  • Page 5 INSTALLATION GUIDELINES 48” FOOTING LAYOUT - 5” ARCH FRAME - ONE BAY 48” FOOTING LAYOUT - 5” ARCH FRAME - TWO BAY 48” FOOTING LAYOUT - 5” ARCH FRAME - THREE BAY 48” FOOTING LAYOUT - 5” ARCH FRAME - FOUR BAY...
  • Page 6 INSTALLATION GUIDELINES FOOTING LAYOUT - 5” TIRE FRAME - ONE BAY FOOTING LAYOUT - 5” TIRE FRAME - TWO BAY FOOTING LAYOUT - 5” TIRE FRAME - THREE BAY FOOTING LAYOUT - 5” TIRE FRAME - FOUR BAY SWING FRAMES Page 6 of 20 DATE: 08/29/2014...
  • Page 7 INSTALLATION GUIDELINES BI-POD and TRI-POD SWING FRAME STEP 1 Refer to PLAN VIEW and FOOTING LAYOUT to locate swing frame. STEP 2 Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in the bottom of each hole. STEP 3 Select top rail(s) of swing frame (2-3/8”x132”), two end yokes and center yoke(s) if applicable.
  • Page 8 INSTALLATION GUIDELINES BI-POD and TRI-POD SWING FRAME (continued) STEP 5 For each bay, select four swing hanger assemblies (PL-SH-23’s). Attach PL-SH-23’s to top rail so that centers of each swing hanger for each swing are at least 20” apart (see Detail B). NOTE: All other side to side measurements will need to be set and verified after swing seats are installed (swing seats and chains are sold separately).
  • Page 9 INSTALLATION GUIDELINES BI-POD FOOTING - ONE BAY BI-POD FOOTING - TWO BAY BI-POD FOOTING - THREE BAY BI-POD FOOTING - FOUR BAY SWING FRAMES Page 9 of 20 DATE: 08/29/2014...
  • Page 10 INSTALLATION GUIDELINES 8’ TRI-POD 8’ TRI-POD FOOTING ELEVATION - END 8’ TRI-POD FOOTING ELEVATION - SIDE 8’ TRI-POD FOOTING - ONE BAY SWING FRAMES Page 10 of 20 DATE: 08/29/2014...
  • Page 11 INSTALLATION GUIDELINES 8’ TRI-POD FOOTING - TWO BAY 8’ TRI-POD FOOTING - THREE BAY 8’ TRI-POD FOOTING - FOUR BAY SWING FRAMES Page 11 of 20 DATE: 08/29/2014...
  • Page 12 INSTALLATION GUIDELINES 10’ TRI-POD 10’ TRI-POD FOOTING ELEVATION - END 10’ TRI-POD FOOTING ELEVATION - SIDE 10’ TRI-POD FOOTING - ONE BAY SWING FRAMES Page 12 of 20 DATE: 08/29/2014...
  • Page 13 INSTALLATION GUIDELINES 10’ TRI-POD FOOTING - TWO BAY 10’ TRI-POD FOOTING - THREE BAY 10’ TRI-POD FOOTING - FOUR BAY SWING FRAMES Page 13 of 20 DATE: 08/29/2014...
  • Page 14 INSTALLATION GUIDELINES SINGLE 5” POST SWING FRAME STEP 1 Refer to PLAN VIEW and FOOTING LAYOUT to locate swing frame. STEP 2 Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in the bottom of each hole. STEP 3 Select two vertical posts with caps (5”x144”), two 5”x5”...
  • Page 15 INSTALLATION GUIDELINES SINGLE 5” POST SWING FRAME - continued STEP 5 Select top rail(s) of swing frame and vertical posts. Insert top rails fully into 5”x5” receivers with swing hanger tabs at 6:00. Install and tighten set screws (see Detail C). Top Rail Detail C Top Rail...
  • Page 16 INSTALLATION GUIDELINES FOOTING ELEVATION - SINGLE 5” POST SWING FRAME SWING FRAMES Page 16 of 20 DATE: 08/29/2014...
  • Page 17 INSTALLATION GUIDELINES 18”X36” DEEP 138” SINGLE 5” POST FRAME - ONE BAY 18”X36” DEEP 138” 138” SINGLE 5” POST FRAME - TWO BAY 18”X36” DEEP 138” 138” 138” SINGLE 5” POST FRAME - THREE BAY 18”X36” DEEP 138” 138” 138” 138”...
  • Page 18 INSTALLATION GUIDELINES SINGLE 5” POST SWING FRAME - ADD-A-BAY STEP 1 Refer to PLAN VIEW and FOOTING LAYOUT to locate position of add-a-bay swing frame. STEP 2 Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in the bottom of hole.
  • Page 19 INSTALLATION GUIDELINES SINGLE 5” POST SWING FRAME - ADD-A-BAY - continued STEP 5 Set post in footing. Select top rail for swing frame. Insert top rail fully into 5”x5” receivers with swing hanger tabs at 6:00. Install and tighten set screws (see Detail C). Detail C Top Rail Top Rail...
  • Page 20 INSTALLATION GUIDELINES Measure up 60” from top of finished surfacing. Run string line from end to end of swing frame at this height. The horizontal distance between adjacent to-fro swings at rest shall be no less than 24” when measured at 60”...