Download Print this page

Park Central Arch Installation Manuallines page 20

Swing frames

Advertisement

INSTALLATION GUIDELINES
Measure up 60" from top of finished surfacing. Run string line from end to end of swing frame at this
height.
The horizontal distance between adjacent to-fro swings at rest shall be no less than 24" when measured
at 60" above the protective surfacing.
The horizontal distance between the supporting structure and the adjacent to-fro swing seat shall be no
less than 30" when measured at 60" above the protective surfacing.
Also, once seats are installed, they must be at least 12" above the finished surfacing.
NOTE: All of these measurements need to be taken when swings are occupied my maximum
users.
SWING DETAIL
SWING FRAMES
Page 20 of 20
DATE: 08/29/2014

Advertisement

loading

This manual is also suitable for:

TireBi-podTri-podSingle 5" post