Arch (3-1/2" and 5"), Tire, Bi-Pod, Tri-Pod (8' and 10' Height), Single 5" Post
USER GROUP: 2 - 12
RECOMMENDED CREW: At least 2 people
TOOLS REQUIRED:
1/4" allen head tool
Level
Tape measure
Auger / Post hole digger / Shovel
High speed 3/8" electric drill w/clutch
NOTE: Use of any other driver may result in damage to tool and/or hardware!
INSTALLATION TIME: Varies
CONCRETE REQUIRED:
NOTE: Concrete must have a minimum rating of 2,500 psi and must be mixed per
manufacturer's recommendations.
PRE-INSTALLATION CHECK:
Compare all items received to the packing list. Notify your local sales representative immediately if any
parts are missing or damaged.
We are not responsible for items discovered missing or damaged
Before beginning installation, make sure that you have read and understand the Installation Introduction
manual that was supplied to you. If you did not receive a copy, or if you have a question regarding anything
covered in this manual, contact your local sales representative.
SWING FRAMES
DATE: 08/29/2014
SWING FRAMES
3.53 cubic feet per hole (arch frames)
5.29 cubic feet per hole (single post frames)
7 cubic feet per hole (bi-pod and tri-pod frames)
NOTE: Swing chains and seats are sold separately.
after 72 hours from time of delivery!
Page 1 of 20
INSTALLATION GUIDELINES

Advertisement

loading
Need help?

Need help?

Do you have a question about the Tire and is the answer not in the manual?

Questions and answers

Summarization of Contents

Pre-Installation Checks and Requirements
Pre-Installation Checklist
Compare received items to packing list and notify sales representative of any missing or damaged parts.
Arch and Tire Swing Frames Installation
Locate Swing Frame Position
Refer to plan view and footing layout to determine the correct location for the swing frame.
Excavate Footings and Add Spacer
Excavate footings according to layout and place a 2-inch spacer block at the bottom of each hole.
Assemble Frame Pieces in Footings
Assemble swing frame sections in footings, bracing them. Secure top bar using set screws as shown in Detail A.
Level, Plumb, and Pour Concrete
Ensure frame is level and plumb at 96 inches height. Pour concrete, ensuring it meets 2,500 psi rating and cures for 48 hours.
Install Age Stickers and Seats
Apply age stickers to the frame. Delay attaching seats and chains until the playground is ready to open.
Tire Swing Frame Specific Step
Install the SH-51 tire swivel assembly on the top bar for tire swing frames as detailed in Detail B.
Bi-Pod and Tri-Pod Swing Frames Installation
Locate Bi-Pod/Tri-Pod Frame Position
Consult the plan view and footing layout to identify the correct placement for the bi-pod or tri-pod swing frame.
Excavate and Block Bi-Pod/Tri-Pod Footings
Excavate footings as indicated and place a 2-inch spacer block in the base of each hole.
Assemble Yokes and Top Rails
Connect top rails to yokes, ensuring they are fully inserted. Secure connections with set screws as per details.
Attach Swing Legs to Yokes
Attach swing legs to the yokes, ensuring correct leg lengths for bi-pod/tri-pod configurations, and secure with set screws.
Install Swing Hanger Assemblies
Attach four swing hanger assemblies per bay to the top rail, spaced at least 20 inches apart.
Set Upright, Pour Concrete, and Cure
Position frame upright in footings, pour concrete to the correct level, and allow it to cure for at least 48 hours.
Finalize Bi-Pod/Tri-Pod Frame Setup
Apply age stickers and wait to attach seats/chains until the playground is ready for opening.
Add-A-Bay for Bi-Pod/Tri-Pod Frames
Instructions for expanding bi-pod and tri-pod frames by adding extra bays.
Replace End Yoke with Middle Yoke
Remove the existing end yoke and end poles, and replace them with a middle yoke.
Excavate and Assemble Add-A-Bay
Excavate footings for new posts, set them, and assemble the add-a-bay frame, ensuring alignment and tightening hardware.
Pour Concrete for Add-A-Bay Footings
Fill the excavated footings with concrete meeting 2,500 psi, allow it to cure for at least 48 hours.
Finalize Add-A-Bay Frame Setup
Apply age level stickers and refrain from attaching seats/chains until the playground is ready.
8' Tri-Pod Frame Installation Details
Details on footing elevations and layouts specific to the 8' Tri-Pod swing frame installation.
10' Tri-Pod Frame Installation Details
Information on footing elevations and layouts for the 10' Tri-Pod swing frame.
Single 5" Post Swing Frame Installation
Locate Single Post Frame Position
Consult the plan view and footing layout to find the correct location for the single 5-inch post swing frame.
Excavate and Block Single Post Footings
Excavate footings as per the layout and place a 2-inch spacer block at the bottom of each hole.
Attach Receivers and Saddles to Posts
Attach receivers and saddles to the top of each post using bolts and nuts, ensuring proper spacing and tightening.
Attach Receivers for Multi-Bay Posts
For multi-bay frames, attach receivers to middle posts using bolts and nuts, ensuring even spacing and tightening.
Insert and Secure Top Rails
Insert top rails into the 5x5 receivers on the posts and secure them by installing and tightening set screws.
Install Drive Pins for Frame Stability
Drill holes and install 1/4-inch drive pins through saddles and receivers to secure the frame components.
Position Frame Upright and Plumb
Turn the swing frame upright, brace it at the correct height (96" above surfacing), ensuring it is level and plumb.
Pour Concrete and Allow Curing
Pour concrete into footings to the correct level and allow it to harden for at least 48 hours before use.
Finalize Single Post Frame Setup
Install appropriate age level stickers and delay attaching seats/chains until the playground is ready to open.
Add-A-Bay for Single Post Frames
Instructions for adding an additional bay to an existing single post swing frame.
Prepare Existing Post for Add-A-Bay
Remove the existing saddle and attach a new receiver for the add-a-bay connection, ensuring proper alignment.
Attach New Receiver and Saddle
Attach the new receiver and saddle to the new post using specified bolts and nuts, ensuring correct spacing.
Insert and Secure Add-A-Bay Top Rail
Insert the top rail into the new receivers and secure it using set screws as shown in Detail C.
Install Drive Pins for Add-A-Bay
Drill and install drive pins through the saddle and receivers to secure the components of the added bay.
Verify Alignment and Pour Concrete
Confirm the added bay is level and plumb, then pour concrete into the footing and allow it to cure.
Finalize Add-A-Bay Installation
Apply age stickers and wait to attach seats/chains until the playground is ready for opening.
Swing Detail and Safety Measurements
Swing Placement and Clearance Guidelines
Details on required horizontal and vertical clearances for swings when occupied by users.