INSTALLATION OF THE MACHINE
Main machine views
3
1
2
10
1
Lateral spray tube
2
Basket
3
Lid handle
4
Lid
5
Upper spray tube
6
Gas shock bsorber
7
Safety interlock
8
Elettric pannel
9
Tank
10 Drain valve
11 Probe accomodation
12 Heating junction box
19
REVISIONE: X51-1213 EN
3
4
5
6
7
8
9
20
18
21
13
14
11
13 exhaust fumes
14 Pump 1
15 Gear motor (opt. su L101 e L102)
16 Pump 2 (solo su L102 e L122)
17 Level probe
18 pump suction
19 tank drain
20 tank bottom
21 Heating
22 Temperature probe
23 Safety temperature probe
18
22
23
15
15
16
13
12
10
17
MAGIDO GROUP S.r.l.