INSTALLATION OF THE MACHINE

INSTALLATION OF THE MACHINE
The machine should be installed in a location where the atmospheric conditions are respected
for the well being of the operator in order to reduce to a minimum stress and strain and allow
the operator to work in maximum safety conditions.
The area in which the machine is installed must be well aired and without the presence of
explosive gases.
The temperature of the area where the machine is installed should be between 10°C and 40°C.

Free working spaces

To allow a correct use and easy maintenance over the machine, in secure conditions, we advice that the
machine be installed in a position that respect the minimum distance, indicated in millimetres, from walls and
large obstacles as indicated in the pictures.

Positioning of the machine

The machine must be installed on a smooth industrial type pavement that permits a uniform closure of the
mobile protection (door).
It is not necessary to anchor the machine to the floor
REVISIONE: X51-1213 EN
1000
SPAZIO LIBERO PER L'OPERATORE
14
1000