g028544
1. Flange locknut (4)
2. ROPS plates (4)
3. Rollbar
Installing the Rollbar
1. Lift the rollbar with the cutouts in ends of the tube
facing up and align the holes with the rollbar supports.
Note: A second person to perform the next step will
be helpful.
2. Attach the rollbar to the rollbar supports as shown in
Figure
8. Leave the bolts loose.
1 2
1. Bolt (1/2 x 3–1/2 inches)
(4)
2. Flat washer (4)
1 2 3
2 4 5
Figure 7
4. Flat washer (4)
5. Bolt (1/2 x 3–1/2 inches)
(4)
4
3
Figure 8
3. Flange locknut (4)
4. Rollbar
Making Final Adjustments
1. Tighten the fasteners in the order specified in the
following table.
help identify the parts.
Sequence
1
2
3
4
Note: Do not exceed torque specifications. Doing so
may cause structural damage to the ROPS or the frame
of the machine.
2 1
g028545
5
Figure 6,Figure
7, and
Figure 8
Description
Four bolts on each
400 ± 40 in-lbs
side attaching the
(45 ±.4 N-m)
pivot brackets to
the rollbar and
rollbar support.
Two bolts on each
300 ± 30 in-lbs
side attaching the
(34 ± 3 N-m)
rollbar support to
the frame and the
rollbar support to
the brace .
One bolt on each
75 ± 8 ft-lbs
side attaching
(102 ± 11 N-m)
the braces to the
machine frame.
One bolt on each
60 to 80 in-lbs.
(7 to 9 N-m)
side attaching the
rollbar to the engine
guard.
will
Torque