Haier HPU-90CA03T3 Operation Manual page 24

Cabinet unit cooling unit
Hide thumbs Also See for HPU-90CA03T3:
Table of Contents

Advertisement

Installation procedure
Matters needing attention
Never use oxygen,flamable and poisonous gases for the leak test.
Indoor
Solder joint
Tightly
closed
Indoor unit
To the gauge
distributor
(Liquid side)access hole
Field tube
installation
Step 1:Charge for more than 3 minutes under 0.3MPa(3.0kg/cm
Step 2:Charge for more than 3 minutes under 1.5MPa(15kg/cm
--Serious leakage may be found.
Step 3:Charge for more than 24 hours under 3.0MPa(30kg/cm
--Small leakage may be found.
Check for pressure decrease
Without pressure decrease-Pass
With pressure decrease-Check for leakge.
There will be a 0.01MPa(0.1kg/cm
the 24-hour pressure charge.It should be corrected during the test.
All manuals and user guides at all-guides.com
Outdoor
Solder joint
Solder
joint
Detailed diagram of the
three-way valve
(Liquid side)three-way valve
g) pressure change for every 1 C ambient temperature change during
2
Low-pressure
gauge
Three-way valve fully
closed(gas side)
Access hole
6.4
Copper
pipe
Access hole
Outdoor unit
Three-way valve fully closed
liquid side
(Gas side)three-way valve
To the unit
Field tube
installation
g)
2
g)
2
g)
2
23
Outdoor unit
High-pressure
gauge
VL VH
Gauge distributor
Relief valve
6.4
Copper pipe
(Gas side )
access hole
To the unit

Advertisement

Table of Contents
loading

Table of Contents