Step 7 - Convert To Horizontal And Connect; Ductwork (When Required) - Carrier WeatherExpert 48JC04 Installation Instructions Manual

Ultra high efficiency single package rooftop gas heating/electric cooling unit with puron (r-410a) refrigerant
Table of Contents

Advertisement

"B"
REQUIRED
SPREADER
BARS
UNIT
48JC**04
48JC**05
48JC**06
NOTES:
1. SPREADER BARS ARE REQUIRED. Top damage will occur if spreader bars are not used.
2. Dimensions in () are in millimeters.
3. Hook rigging shackles through holes in base rail, as shown in Detail A. Holes in base rails are centered around the unit center of
gravity. Use wooden top to prevent rigging straps from damaging unit.
Flue gas can deteriorate building materials. Orient unit such
that flue gas will not affect building materials. Locate mechan-
ical draft system flue assembly at least 48-in. (1220 mm) from
an adjacent building or combustible material.
NOTE: Installation of accessory flue discharge deflector kit will
reduce the minimum clearance to combustible material to 18-in.
(460 mm).
After unit is in position, remove rigging skids and shipping
materials.
Step 7 — Convert to Horizontal and Connect

Ductwork (When Required)

Unit is shipped in the vertical duct configuration. Unit without
factory-installed economizer or return-air smoke detector
option
may
be
field-converted
configuration. To convert to horizontal configuration, remove
screws from side duct opening covers (see Fig. 6) and remove
covers. Use the screws to install the covers on vertical duct
openings with the insulation-side down. The panels must be
inserted into the notches on the basepan to properly seal. The
notches are covered by the tape used to secure the insulation to
the basepan and are not easily seen. See Fig. 7 for position of
the notches in the basepan. Seals around duct openings must be
tight. Secure with screws as shown in Fig. 8. Cover seams with
foil duct tape.
Field-supplied flanges should be attached to horizontal duct
openings and all ductwork should be secured to the flanges. In-
sulate and weatherproof all external ductwork, joints, and roof
or building openings with counter flashing and mastic in accor-
dance with applicable codes.
Do not cover or obscure visibility to the unit's informative data
plate when insulating horizontal ductwork.
36"- 54"
(914-1371)
"C"
"A"
SEE DETAIL "A"
MAX WEIGHT
lb
kg
in.
963
437
74.5
1018
462
74.5
1020
463
74.5
Fig. 5 — Rigging Details
to
horizontal
ducted
PLACE ALL SEAL STRIP IN PLACE
BEFORE PLACING UNIT ON ROOF CURB.
DUCT END
DIMENSIONS
A
mm
in.
1890
35.8
1890
35.8
1890
35.8
REMOVABLE HORIZONTAL
RETURN DUCT OPENING COVER
Fig. 6 — Horizontal Conversion Panels
NOTCHES
Fig. 7 — Location of Notches
10
DETAIL "A"
B
C
mm
in.
910
41.5
910
41.5
910
41.5
REMOVABLE HORIZONTAL
SUPPLY DUCT OPENING COVER
BASEPAN
mm
1055
1055
1055
NOTCHES

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Weatherexpert 48jc05Weatherexpert 48jc06

Table of Contents