Location Of The Unit - Ortech OD-ERV 150AC Instruction Manual

Energy recovery ventilators
Hide thumbs Also See for OD-ERV 150AC:
Table of Contents

Advertisement

Energy Recovery Ventilators
MODEL
OD-ERV 150AC

LOCATION OF THE UNIT

Select a location so that:
• The fresh air inlet from the outside is placed a minimum of 10 feet from any other exhaust vent
• The two ducts to the outside are as short and straight as possible for the best system performance
• The door can be opened to clean the core and filters conveniently. Provide clearance at front of unit for service access to the
blowers, filters and energy exchange core (minimum 20-1/8" for full door swing, 14-1/4" for door removal from hinges)
• The exhaust outlet to the outside and fresh air inlet from the outside of the building should be at least ten feet apart to
avoid cross-contamination. The exhaust duct should be about the same length as the fresh air duct
• The exhaust outlet should NOT dump air into an enclosed space or into any other structure
The preferred mounting location for the unit is on a concrete foundation wall because the foundation wall isolates any blower
vibration. If a basement area is not available or practical, use other mechanical room space such as a closet, garage, storage, or
accessible attic or crawl space.
** If you locate the unit in an attic or other unconditioned space, all of the unit's ductwork that is located in the attic MUST be
**
insulated. Use at least R-6 insulation
INSTALLATION GUIDE
CAUTION!
RISK OF INJURY WHEN LIFTING AND INSTALLING UNIT OVERHEAD:
Get a helper and wear eye protection and gloves.
Locate the unit for the simplest duct layout and connections.
Note that the door is equipped with hinges. For the
homeowner's convenience, it is helpful to locate the unit so that
the door does not drop off when it is unlatched.
Unit Installation
Installation A
a1) Mount the 4 brackets to the unit as illustrated at right,
a1)
using two screws provided for each bracket through
a1)
2 appropriate holes. Unit may be installed in any orientation.
a1)
Be careful as condensation could be present when outdoor
a1)
temperature is low
a2) Secure the unit to the truss by screws provided through the
a2)
smaller hole of the brackets
Installation B
b1) Trace a level line on both trusses, at 1-1/16" from the bottom
b1)
(based on the ceiling sizes is 1/2", if not this size, needs to be
b1)
adjusted properly), for the unit bracket location.
b1)
On one truss, screw half way on level line two provided screws,
b1)
leaving 24-7/8" between each other
b2) Mount the 4 brackets to the unit as illustrated on the right,
b2)
using 2 screws provided for each bracket through 2 appropriate holes.
b2)
Screw half way the screws to allow adjustment between trusses within
b2)
23" and 21-1/4" (left shows the minimum distance and right the
b2)
maximum distance)
info@ortechindustries.com
www.ortechindustries.com
13376 Comber Way
375 Admiral Blvd
Mississauga
Surrey BC V3W 5V9
24-7/8" (632mm)
,
ON L5T 2N1
Instruction Manual
1-1/16"
(27mm)
1-888-543-6473
1-888-541-6474

Advertisement

Table of Contents
loading

Table of Contents