Inspection Of The Unit; Related Documentation - Chiller BOX Vari Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

N02118905 Rev. A
1.3
The units are shipped from the factory as assembled (apart from some
accessories), wired, and tested. In some unit models, part of the grille is shipped
in a separate package for mounting onto the lower surface of the lowered ceiling
after installation.
When you receive the unit:
1. Inspect the delivery against the order.
2. Verify that the contents of the delivery meet the order.
3. Inspect all the delivered units carefully.
1.4
In addition to this manual, the unit is delivered with a unit-specific wiring
diagram.
In case you need a new wiring diagram, you can order it. You need the unit
serial number from the type plate for the order. (See Section 3.3 Type plate.)
Copyright © 2020. All rights reserved.
BOX Vari & Vari Pro – Installation, Operation, and Maintenance Manual

Inspection of the unit

a. If the units have transport damages, notify the expeditor and the seller of
them.
b. Record the transport damages on the bill of freight.
c. Send a complaint about the damages to the transport company within 24
hours of delivery.

Related documentation

5 (41)

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BOX Vari and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Related Products for Chiller BOX Vari

This manual is also suitable for:

Box vari pro

Table of Contents