6.2
Performing the pressure test and the function test
1. Apply 6 bar of pressure to the system for a period of two hours.
2. Perform a leak test after two hours.
- The pressure drop must not exceed 0.2 bar.
3. Fill the system with water until the operating pressure is reached.
6.3
Adjusting the flow valves with a flow meter
Commissioning
ECOLLECTRMV
1. Open the flow valve at the red
adjustment ring until the calcu-
1
lated water volume is indicated at
the flow meter (1).
2. Pull the white adjustment ring up
to unlock.