Daikin ECOLLECTRMV Operating Lnstructions page 16

Heating circuit manifold (stainless steel)
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
EN
6
Commissioning
6.1
Commissioning the product
1
5
4
vent
7
180°
14
Commissioning
2
3
Filling hose
6
1. Connect a hose to the drain valve
(3).
2. Open the drain valve (3) at the
spindle (5) for filling and flushing.
3. Open the return valve of the first
heating circuit (1).
4. Slightly open the flow valve of the
first heating circuit (4).
5. Close all other valves (2).
6. Fill the heating circuit with a max-
imum of 5 bar and flush it.
7. Fully open the flow valve (4) as
soon as water flows into the heat-
ing circuit.
8. Close the flow valve and the
return valve of the filled heating
circuit.
9. Repeat this procedure for all other
heating circuits.
10.Vent the system by rotating the
outlet by 180° at the drain valve
(6) and open the spindle (7).
ECOLLECTRMV

Advertisement

Table of Contents
loading

Table of Contents