Download Print this page

Kendall Howard 1940-3-100-24 Assembly Instructions page 3

4-post adjustable rack

Advertisement

Grounding Studs: Note that there are 1/4-20 Grounding
Studs on the top and bottom of each Vertical Rail. See
placement below.
Bottom Location
Top Location
Step 4:
Mount one arm at a time to each side using the
included 10-32 Rack Screws. Place the arm assem-
blies at the upper corners and lower corners. The
more screws that you use to mount the arms , the
stronger the overall rack will be. Each arm allows for
six screws per side. To maintain the published weight
capacity, six screws are required.
To adjust the racks depth:
Take out the 7/16 hardware in the arm assemblies
and slide the two sides together or apart and
reinstall hardware in the arm assemblies.
Rack Screws:
For your convenience, fifty 10-32
rack screws have been provided to
install rackmount equipment into
your new relay rack. If you should
need additional hardware please
contact us, or an authorized
reseller, today.
PHONE: 651-213-1233
Email: sales@kendallhoward.com

Advertisement

loading

This manual is also suitable for:

1940-3-100-45