Download Print this page

Tools And Materials; Before You Begin - Kohler K-2600 Installation Manual

Self-rimming/undercounter lavatories
Hide thumbs Also See for K-2600:

Advertisement

Available languages

Available languages

Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.

Tools and Materials

Template
Pencil
(supplied)
Screwdriver
Keyhole Saw

Before You Begin

WARNING: Risk of personal injury. Metal surfaces are sharp
and can cause severe cuts. Use gloves and handle lavatory
edges carefully.
Observe all local plumbing and building codes.
Prior to installation, unpack the new lavatory and inspect it for
damage. Return the lavatory to its protective carton until you are
ready to install it.
Inspect the drain and supply tubing. Replace if necessary.
Do not substitute another sealant if one is supplied with this
lavatory.
Use the template supplied with the lavatory.
For replacement installations, make sure the existing cutout is the
same size or smaller than needed for the new lavatory.
1018896-2-C
Safety
Drill
Adjustable
Glasses
Wrench
Plus:
• 1/2" drill bit
• Ruler
Tape
• Hole Saw
Measure
• Gloves
2
Kohler Co.

Advertisement

loading

This manual is also suitable for:

K-2602K-2603K-2605K-2610K-2611K-2612