Break-In Procedure - Nakanishi PLANET600 Series Operation Manual

High-speed jig grinding air turbine spindle
Table of Contents

Advertisement

CAUTIONS IN USING AIR LINE KIT
・ Make sure operation air pressure is less than 1.0MPa (145psi) before connecting the
input supply connection hose and air / oil supply hose. If operation air pressure is
exceeds 1.0MPa (145psi), injury to the operator may occur by accidental disconnection
before or during use.
・ Before use, carefully read " Air Line Kit Operation Manuals " regarding the correct
connection, operation and cautions when using the Air Line Kit.
Primary Joint
Connector for Air Hose
Connection Hose
To Air Compressor
Fig. 7 Connection of Air Line Kit " AL - M1202 (Sold Separately) "
10.

BREAK-IN PROCEDURE

During transportation, storage or installation, the oil inside the bearings may settle. If the Air Turbine
Spindle is suddenly run at high-pressure, the bearings may not have sufficient lubrication, causing
excessive heat that will cause bearing damage.
After installation, repair, initial operation, or long periods of non operation, please carry out break-in as
follow. Slowly supply the air pressure to the Air Turbine Spindle over a period of 10 minutes, increasing
the supply air pressure until working pressure is reached.
26
Adjusting Dome
Oil Filler Cap
ON / OFF Valve
Secondary Joint
φ6 One - Touch
Joint
Regulator Knob
Silencer
Supply Air /
Oil Hose
Filter Joint

Advertisement

Table of Contents
loading

Related Products for Nakanishi PLANET600 Series

This manual is also suitable for:

Pl600-m2040Pl600-h3440

Table of Contents