Installation Orientation - Omron BUM5002R Instruction Manual

Expansion battery unit
Table of Contents

Advertisement

1 Preparation

1-3 Installation orientation

1-3 Installation orientation
When installing the unit, install it in the correct orientation as shown in the following figures.
⚫Correct positions
<When installed horizontally>
• Do not install the unit upside down.
• Do not stack the units. Install them in the rack.
16
UPS main unit
Expansion battery unit
BUM5002R/BUM3002R

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bum3002r

Table of Contents