Gas fired wall mounted condensing combination boiler (24 pages)
Summary of Contents for EHC FUSION Series
Page 2
Page Contents INTRODUCTION PREPARATION INSTALLATION ELECTRICAL CONNECTIONS AND CONTROLS EXTERNAL CONTROL WIRING INTERNAL BOILER WIRING EXTERNAL BOILER WIRING BOILER DIMENSIONS USER INSTRUCTIONS FAULT FINDING TECHNICAL SPECIFICATIONS This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.
Page 3
PREPARATION Instructions and Building Regulations This appliance must be fitted in accordance with the following instructions. The Local Building Regulations The Building Regulations The Building Standards, (Scotland-consolidated) Regulations. Local water bylaws. British Standards- code of practice BS EN 12828 Heating systems in buildings. Design for water-based heating systems.
INSTALLATION 6. Insulation The boiler must be installed by a professional plumber or heating engineer and must be connected to the power supply by a qualified electrician. Where practical and if at all possible, we recommend that all pipe-work be insulated, in particular the primary pipe-work The Electric Heating Company Ltd will not be held responsible within the boiler cupboard.
Page 5
11. System types 13. Commissioning IMPORTANT: The 6, 9, 12, 14.4, 36 & 48kW boilers can be used in various TURN ON THE ELECTRICAL POWER SUPPLY TO THE BOILER. system designs. Please refer to The Electric Heating Company for MAKE SURE THAT THE PROGRAMMER IS NOT CALLING FOR more details on our Fusion Boiler for under floor heating.
14. Start-up / commissioning 1. Ensure the system is filled with water and correctly vented. 2. Check if the appropriate system installation pressure is reached (see the “TECHNICAL DATA” section) by referring to the pressure gauge at the bottom left of the boiler 3.
ROOM THERMOSTAT for heating only installations. connection For Heating and Hot water installations, we recommend the use of our “Twin Heat Pack” which includes the EHC ROOM UNDER NO CIRCUMSTANCES SHOULD A VOLTAGE BE THERMOSTAT & AN EHC 2 CHANNEL PROGRAMMER. The...
USER INSTRUCTIONS Unlike other system boilers such as Gas, Oil and Propane, the 3. Front Control Panel FUSION range of electric boilers require no ignition or lighting sequence to be executed by the end user. All the end user is Indicator B When GREEN light is on the pump is operating.
FAULT FINDING Symptom Reason Procedure No power to the boiler Check electricity mains power supply The indicators on the front panel Check the power board fuse F2 are off Main over heat stat cut-out Check the WT3 temperature safety cut-out investige cause - possibly fault / return sensors Check flow sensor The central heating system airlock - vent the central heating system...
0,03 Ω The maximum allowed network impedance ERP Rating NB: Voltage free control connections Controls Central Heating Only: EHC Single Channel Heat Pack Central Heating & Domestic Hot Water: EHC Twin Channel Heat Pack Boiler Dimensions Slimline FUSION 48 FUSION...
Page 20
Electric Heating Company Ltd Unit 40, Block 5 Third Road Blantyre Industrial Estate Blantyre Glasgow G72 0UP Tel: 01698 820533 Fax: 01698 825697 www.electric-heatingcompany.co.uk (Waste Electrical & Electronic Equipment) (Applicable in the European Union and other European countries with separate collection systems).
Need help?
Do you have a question about the FUSION Series and is the answer not in the manual?
Questions and answers