Heat Recovery Package (Hrp) Setup; Water Tank Preparation - Bosch Greensource CDi TW Series Installation, Operation And Maintenance Manual

Water-to-water heat pumps
Table of Contents

Advertisement

14 | Heat Recovery Package (HRP) Setup

HEAT RECOVERY PACKAGE (HRP) SETUP

Water Tank Preparation

1. Turn off electrical or fuel supply to the water
heater.
2. Attach garden hose to water tank drain
connection and run other end of hose out
doors or to an open drain.
3. Close cold water inlet valve to water heater
tank.
4. Drain tank by opening drain valve on the
bottom of the tank, then open pressure relief
valve or hot water faucet.
5. Once drained the tank should be flushed with
cold water until the water leaving the drain
hose is clear and free of sediment.
6. Close all valves and remove the drain hose.
7. Install HR water piping.
Fig. 8 HR Water Piping
8733954853 (2020/04)
NOTICE: All piping from HRP to domestic
water tank must be copper.
Concentric water fitting (p/n 8733907119)
is recommended. (See Fig. 8.)
All hot water piping MUST be a minimum of 3/8"
O.D. copper tubing to a maximum distance of 15
feet. For distances beyond 15 feet but not
exceeding 60 feet use 1/2" copper tube.
Separately insulate all exposed surface of both
connecting water lines with 3/8" wall closed-cell
insulation. Install isolation valves on supply and
return to the heat recovery. (See Fig. 8 below.)
NOTE: This diagram is for illustration purposes only.
Ensure access to Heat Pump is not restricted.
Subject to change without prior notice
Greensource CDi Series TW Model
Greensource CDi Series TW Model

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents