PENN Connected PC10 Commissioning
Guide
PC10
Johnson Controls
LIT-12013314
www.penncontrols.com
2020-03-03

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Connected PC10 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Penn Connected PC10

  • Page 1 PENN Connected PC10 Commissioning Guide PC10 Johnson Controls LIT-12013314 www.penncontrols.com 2020-03-03...
  • Page 3: Table Of Contents

    Installing the temperature sensors..................... 9 Installing the door sensors......................10 Commissioning the gateway...................... 11 Commissioning the sensors......................12 Signing off............................. 13 Related documentation....................... 14 Single point of contact......................... 15 Software terms..........................16 Product warranty.......................... 17 Patents............................18 PENN Connected PC10 Commissioning Guide...
  • Page 5: Introduction

    Introduction This document describes how to install and commission a PENN Connected PC10 Remote Wireless Monitoring System to monitor refrigeration equipment. The following inexhaustive list provides examples of refrigeration equipment that the PC10 system can monitor: • Wall chillers • Wall freezers •...
  • Page 6: Surveying The Site

    See the following figure and table for the typical layout of a site and its hardware. Figure 1: Typical site layout Note: The shaded cells indicate refrigeration units. Table 2: Typical site layout Callout Description Gateway Repeaters Freezer room Chiller room PENN Connected PC10 Commissioning Guide...
  • Page 7: Mounting Guidelines

    • Mount the gateway and repeaters in an open enclosure in a safe and secure position. • The maximum range from a gateway to a sensor is 30 m (98.42 ft). • It is best practice to install independent power supplies for the gateway and repeaters. PENN Connected PC10 Commissioning Guide...
  • Page 8: Installation Sequence

    Installation sequence About this task: Install the hardware in the following sequence: Gateway Repeaters Temperature and door sensors PENN Connected PC10 Commissioning Guide...
  • Page 9: Installing The Gateway

    (GSM) network. - The server light turns green when the gateway connects to the server. Figure 2: Gateway power on sequence Table 3: Gateway power on sequence Callout Description Power light Data light Server light PENN Connected PC10 Commissioning Guide...
  • Page 10: Installing The Repeaters

    1. Identify the locations for the repeaters. 2. Mount the repeaters with or without a bracket. To secure the repeaters, use screws, tie wraps, or double-sided tape. 3. Connect the repeaters to a power supply; the repeaters flash blue. PENN Connected PC10 Commissioning Guide...
  • Page 11: Installing The Temperature Sensors

    Swipe the sensor once from top to bottom with a magnet and observe the following light sequence: - The sensor light turns blue. - The sensor light flashes green approximately four times. - The sensor light turns off. PENN Connected PC10 Commissioning Guide...
  • Page 12: Installing The Door Sensors

    Swipe the sensor once from top to bottom with a magnet and observe the following light sequence: - The sensor light turns blue. - The sensor light flashes green approximately four times. - The sensor light turns off. PENN Connected PC10 Commissioning Guide...
  • Page 13: Commissioning The Gateway

    Commissioning the gateway On the Android device, open the PENN Connected Commissioning app and enter the username and password that the PENN Connected administrator sent by email. Commission the gateway in one of the following ways: - Locate the unique 15 or 16-digit serial number on the side of the gateway. In the ICCID or IMEI field, enter the serial number, and tap Register.
  • Page 14: Commissioning The Sensors

    From the Select alarm configuration list, select the appropriate alarm parameter from the available options. Note: You can change these alarm parameters on the PENN Connected platform. On the Manage Alarms page, click on the alarm row to open the Edit Sensor dialog box.
  • Page 15: Signing Off

    Sign off with X units Submit the commissioned units for the current site. Sign off and view Submit the commissioned units for the current site, and view them on the PENN Connected platform. Sign off and add new Submit the commissioned units for the current site, and commission a new site.
  • Page 16: Related Documentation

    Related documentation Table 4: Related documentation Document title Document Number PENN Connected E10 Temperature Sensor Catalog Page LIT-1901118 PENN Connected E11 Temperature Sensor Catalog Page LIT-1901119 PENN Connected R10 Repeater Catalog Page LIT-1901120 PENN Connected C20 Gateway Catalog Page LIT-1901121...
  • Page 17: Single Point Of Contact

    JOHNSON CONTROLS C/O CONTROLS PRODUCT MANAGEMENT WESTENDHOF 3 507 E MICHIGAN ST NO. 32 CHANGJIJANG RD NEW DISTRICT 45143 ESSEN MILWAUKEE WI 53202 WUXI JIANGSU PROVINCE 214028 GERMANY CHINA For more contact information, refer to www.johnsoncontrols.com/locations. PENN Connected PC10 Commissioning Guide...
  • Page 18: Software Terms

    Use of the software that is in (or constitutes) this product, or access to the cloud, or hosted services applicable to this product, if any, is subject to applicable terms set forth at www.johnsoncontrols.com/techterms. Your use of this product constitutes an agreement to such terms. PENN Connected PC10 Commissioning Guide...
  • Page 19: Product Warranty

    Product warranty This product is covered by a limited warranty, details of which can be found at www.johnsoncontrols.com/buildingswarranty. PENN Connected PC10 Commissioning Guide...
  • Page 20: Patents

    Patents Patents: http://jcipat.com © 2020 Johnson Controls. All rights reserved. All specifications and other information shown were current as of document revision and are subject to change without notice.