Download Print this page

Advertisement

Quick Links

1
Remove the handle from the handle rests and place the handle in the full forward
position.
2
Stand the WaterRower upright and disconnect the bungee.
Lay the WaterRower down.
Remove the tie rods and JCB bolts connecting the top deck to the tank assembly.
S3 TO S4 MONITOR UPGR ADE
JCB Bolts
Upper Tie Rods
*Barrel
Nut

Advertisement

loading

Summary of Contents for WaterRower S3

  • Page 1 Remove the handle from the handle rests and place the handle in the full forward position. Stand the WaterRower upright and disconnect the bungee. Lay the WaterRower down. Remove the tie rods and JCB bolts connecting the top deck to the tank assembly.
  • Page 2 You will need to disconnect the tacho pulley and the tacho motor plug. Remove the Tacho Pulley from the clutch. Unfasten the S3 Monitor Retaining Pin & remove the monitor from the key bracket. Place the S4 monitor sensor disk onto the clutch. The internal boss fits around the...
  • Page 3 Position the S4 monitor assembly through the right key bracket as shown. Ensure that the spring and washer orientation is correct. Replace the R Pin retaining the monitor assembly as shown. Place the new S4 Top Deck, top side down, on the top of the tank on the side opposite the monitor.
  • Page 4 Stand the WaterRower upright and connect the recoil belt to the bungee. Note: If the recoil belt buckle and D-ring have been removed it will be necessary to refit them before Step 9 may be completed. Refer to the Recoil Buckle Replacement instructions at www.waterrowerservice.com for details.

This manual is also suitable for:

S4