Summary of Contents for Green Mountain Grills Davy Crockett
Page 1
See page 59 of your manual for an alternative way to prime the firebox if the grill has run out of pellets throughout a cook. RECOMMENDED INSTALLATION OF THE HEAT SHIELD Davy Crockett Heat Shield Placement Approx. 4” from the inside left wall will create optimal heat distribution.
Page 2
STANDARD STARTUP IMPORTANT: If this is your first startup, please see the FIRST STARTUP section on the previous page. Plug in the grill. The display should read off. Press the red power button to turn the unit on. The unit will go through it’s 0-1-2-3 process and will heat up to 150°F.
Page 3
RECOMMENDED INSTALLATION OF THE GREASE TRAY HALF-MOON LEFT SIDE VERY IMPORTANT: Install the grease tray correctly according to the picture, before grilling. This ensures proper travel of grease into your grease trough and down into your grease bucket. For easy cleanup, feel free to wrap the grease tray in tin foil.
Page 4
RECOMMENDED STEPS FOR This procedure is a way to ensure the auger feeds pellets FIRST STARTUP and primes the firebox. ONLY perform these steps on the very first startup or to fill the auger and recharge the firebox if the grills runs out of pellets during a cook. Once the grill is plugged in, the display will read Once the unit hits number 1 on the screen, unplug off.
Need help?
Do you have a question about the Davy Crockett and is the answer not in the manual?
Questions and answers