Download Print this page

Toro 08860 Installation Instructions page 2

Discharge chute kit for sand pro, grounds pro and groundsmaster debris blowers

Advertisement

Figure 5
1. Deflector
7. Mount chute assembly to discharge opening with a
pivot rod, (2) flat washers and cotter pins. Position
components as shown in figure 6.
1
Figure 6
1. Pivot rod
8. Hook spring onto eye bolt and spring mount bracket
(Fig. 3 & 4).
9. Measure, mark and cut off handle tube to required
length for specific blower application.
Amount to cut off handle tube:
SandPro – 20 to 24 inches
Groundsmaster 200 Blower – 10 to 12 inches
Groundsmaster 300 Blower – 10 to 12 inches
GroundsPro 2000 Blower – None
Figure 7
1. Handle
1
1
Cut to length
10. Slide handle tube into handle support and loosely
secure with (2) U–bolts, washers and nut (Fig. 8).
Figure 8
1. Handle tube
11. Mount handle assembly to blower mounting tabs with
a washer and cotter pin (Fig. 9).
2
Figure 9
1. Handle assembly
12. Mount linkage rod to handle assembly with a washer
and cotter pin (Fig. 9).
13. Mount linkage rod to deflector assembly with a washer
and cotter pin (Fig. 10).
Figure 10
1. Linkage rod
2
1
2
2. Handle support
1
2. Linkage rod
1

Advertisement

loading