Do you have a question about the RZ 122 and is the answer not in the manual?
Questions and answers
Summary of Contents for NTC RZ 122
Page 1
NTC STAVEBNÍ TECHNIKA spol. s r.o. 120, 552 03 Česká Skalice Czech Republic fax: +420 491 401 609 Tel.: +420 491 452 184 www.ntc.cz E-mail: ntc@ntc.cz OPERATION MANUAL ASPHALT AND CONCRETE CUTTERS ORIGINAL OPERATION MANUAL (2006/42EC) Models: RZ 122, RZ 172, RZ202...
Page 2
Prohlašujeme, že zařízení definované níže uvedenými údaji je ve shodě s požadavky níže uvedených NV a směrnic We declare that the trough below mentioned specifications defined equipment complies with requirements of below cited Directives Výrobce (manufacturer): NTC STAVEBNÍ TECHNIKA spol. s r.o. Sídlo firmy (company domicile): á 120, Česká Skalice 552 03 Sídlo provozovny:...
Phone: +420 491 452 184, fax: +420 491 401 609 E-mail: ntc@ntc.cz NTC STAVEBNÍ TECHNIKA spol. s r.o. is a light construction equipment manufacturer with a long- term experience. NTC machines are exported to many European countries, among others to Spain, Netherlands, Italy, Hungary, Romania and Russia.
Page 4
Asphalt and concrete cutters Operation manual OPERATION ..............................14 4.1................................. 14 TARTING 4.1.1. Gasoline Engines HONDA and ROBIN....................14 4.2..............................14 PERATION 4.2.1. Selection of the Cutting Disc ......................... 14 4.2.2. Fastening of the Cutting Disc ........................ 16 4.2.3.
Asphalt and concrete cutters Operation manual SAFETY INSTRUCTIONS 1.1. General instructions for operation of light construction equipment 1.1.1. Requirements for qualification of the operator 1. The machine must be operated by 2. The operator is obliged to use suitable trained reliable operators of age above working dress, safety gloves and firm boots 18.
Asphalt and concrete cutters Operation manual prohibited to operate the machine until Don´t fill the fuel up to the edge of the tank. fixing the problem. Clean any fuel which runs over the tank. 2. During operation use suitable working dress required by related regulation (helmet, ear 8.
Asphalt and concrete cutters Operation manual 5. Always secure the machine against falling, 6. Machine can be transported only in upright tipping or sliding during transport. position with hand brake engaged. 1.2. Prohibited activities • operate the machine within the protective Never: •...
Operation manual In accordance with regulation of wastes the owner of liquidated machine needs to oblige: NTC is not responsible for harm of user´s health pass the iron parts only to companies or environment in case of breaking higher who are authorised to handle and mentioned hygienical an ecological rules.
Page 9
Asphalt and concrete cutters Operation manual 1.8. List of used safety stickers In accordance with requirement of regulation no. 22/1997 Sb. about technical requirements of products, there are decals of safety marks and symbols placed on mentioned models of floor cutters (models – in point 2.1.).
Company NTC STAVEBNÍ TECHNIKA spol. s r.o. is registered by company EKO-KOM a.s. Agreement about the repurchase of all kinds of packing materials “Agreement of associated fulfillment” is concluded with company EKO-KOM a.s., by company NTC STAVEBNÍ TECHNIKA spol. s r.o. or suppliers of packing materials.
Asphalt and concrete cutters Operation manual 2.4. Engine Identification In case of problems related to the engine report Fir. Location of the S/N on engine HONDA also engine type and serial number. This number is stamped on the engine block (HONDA) If you have doubts, contact the manufacturer.
Asphalt and concrete cutters Operation manual 3.2. Visual Inspection of the Machine • free motion of the cutting disc spindle Check regularly the machine for: • missing parts Pay special attention to safety devices (covers) • released bolts and screws and controls.
4.2.4. Cutting Depth Scale Cutters RZ 122, RZ 172, RZ 202 have the 2. Alternatively you can just remember the cutting depth scale. Use the scale as follows: value on the scale and then add or subtract 1.
Asphalt and concrete cutters Operation manual 4.4. Handling, Transport, Storing When handling the machine keep safety general safety rules valid for operation of lifting regulation shown in this manual and well as or hoisting equipment. 4.4.1. Manual Handling For manual lifting, cooperation of mode people is required.
Asphalt and concrete cutters Operation manual MAINTENANCE The basic activities of maintenance, which are described in this Manual can be carried out by the designated operator. Repairs and adjustments beyond the extent of this Manual should be committed to an authorized service. Bolted connections to the loop control of depth of cut and the nut of guide arm are glued.
To be carried more often when operating in dusty environment!!! Such maintenance should be performed by service technicians NTC, respectively. authorized service according to engine type, especially if the user does not have the proper tools and knowledge about these devices.
Page 20
Please send properly filled protocol by fax, e-mail or post to above mentioned address, you will speed the process up! Accepting the warranty (to be filled in by warranty dept. of NTC): Date of repair start: Date of repair...
Page 21
Used spare parts: Part no. Description Tech. director sign. Production director sign Finishing warranty management (to be filled by warranty dept. of NTC): Arranged by: Way of transport: Shipment date: Returning the machine to owner (in case of repair in...
Page 22
ГРАФИК РАБОТЫ: Пн. – Пт.: с 8:30 по 18:30 Сб.: с 09:00 по 16:00 Вс.: с 10:00 по 16:00 КОНТАКТЫ: +38 (044) 360-46-77 +38 (066) 77-395-77 +38 (097) 77-236-77 +38 (093) 360-46-77 Детальное описание товара: https://storgom.ua/product/shvonarezchik-ntc-rz1-2.html Другие товары: https://storgom.ua/shvonarezchiki.html...
Need help?
Do you have a question about the RZ 122 and is the answer not in the manual?
Questions and answers