Brazing Reference Drawing - DAEWOO ELECTRONICS FRN-U20IC Service Manual

Table of Contents

Advertisement

7-5. Brazing Reference Drawings.
Hot Pipe
R
▶ Welding Point
▶ Flow of Refrigeration Cycle
High
Suction Pipe
F
Dryer
Capi-Tube
Copper Welding (Ag 5%)
Silver Welding (Ag 35%)
Accumulator
Evaporator
Pipe Suc Conn
Condenser
Pipe Conn B
Compressor
7 Points
3 Points
60
I-Pipe
Low

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents