Led Lights Attachment - Screen Innovations ZERO EDGE PRO Owner's Manual

Hide thumbs Also See for ZERO EDGE PRO:
Table of Contents

Advertisement

LED LIGHTS ATTACHMENT

If IP controlled LED lights are ordered, Phillips Hue hub must be purchased
and set up separately, see page 50 for IP lighting Instructions.
NOTE: Steps 1 and 2 will have already been completed if possible to be shipped that way.
If so skip to step 3.
1
2
ZERO EDGE PRO
Connect the lighting harness
with the included screws to
the nuts in the frame piece
with the lights attached to it.
Plug in the lights to the
controller plugs.
17

Advertisement

Table of Contents
loading

Table of Contents