Step 6) Heat Insulation - LG MULTI V WATER IV ARWN080LAS4 Engineering Product Data Book

380-415v + 380v r410a 50hz/60hz 0cvw0-01n replaces 0cvt0-01m
Hide thumbs Also See for MULTI V WATER IV ARWN080LAS4:
Table of Contents

Advertisement

MULTI V Water IV
6. Installation
4) Service port: Make the refrigerant pipe vacuum and charge it using the service port. Always reattach caps
after completing work (tightening torque of service cap: 14Nm (140kg-cm) or more).
5) Liquid pipe
6) Gas pipe
7) Elbow joint (field supply)
CAUTION
After installing the pipe, block the pipe escape of front and side panel. (It can cause mouse or other animals to
enter and cause damage to the wire.)
* Remove the front panel before pipe connection
* Must check the pipe (liquid pipe, gas pipe, high/low pressure common pipe) before pipe connection

Step 6) Heat Insulation

1) Use the heat insulation material for the refrigerant piping which has an excellent heat-resistance(Over 120°C)
2) When installing in a humid environment, use thicker heat insulation material.
* Consult with LG on detailed technical specification.
12
Heat Pump
Ball Valve(Liquid Pipe)
Liquid pipe
Gas pipe
High/Low Pressure Common
Water pipe outlet
Indoor unit
Elbow
Ball Valve(Gas Pipe)
Fastening band
(accessory)
Refrigerant piping
Thermal insulator
(accessory)
Installation of Outside Units

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents