Bosch Condens 7000 F Installation And Maintenance Instructions For The Contractor page 36

Gas-fired condensing boiler
Hide thumbs Also See for Condens 7000 F:
Table of Contents

Advertisement

Inspection and maintenance
▶ Pull the ignition cables [1] off the ignition electrodes.
1
Fig. 39 Ignition electrodes
[1]
Ignition electrodes without ignition cables
▶ Disconnect the plug-in connector (compensation and ionisation line).
1
2
Fig. 40 Disconnecting the plug-in connector
[1]
Compensation line
[2]
Ionisation line
▶ Undo the union nut ( Fig. 41, [1]) of the gas supply pipe
( Fig. 41, [2]).
36
CAUTION:
Material damage and leaks due to power transmission!
▶ When removing and installing the gas pipe, counterhold to avoid
subjecting other components to stress.
1
2
0010012573-001
Fig. 41 Union nut with gas pipe
[1]
Union nut
[2]
Gas pipe
With room sealed operation:
▶ Release the hinged pipe clip [2] on the supply air hose [3].
▶ Pull off supply air hose together with the connector from the
ventilation air collector [1].
(Chapter 5.7, page 18)
0010014092-001
Fig. 42 Air supply pipe
[1]
Ventilation air collector
[2]
Hinged pipe clip
[3]
Supply air hose
▶ Remove 4 fixing nuts [1] on the flange of the mixture manifold.
0010012554-001
0010012555-001
Condens 7000 F – 6720871560 (2019/11)
1
2
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents