Hide thumbs Also See for MI TOWER+:

Advertisement

Quick Links

A S S E M B L Y G U I D E
F OR MI TOWE R+
MI
TOWER+
info@popupproducts.co.uk
popupproducts.co.uk
+44 (0)1244 833 933

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MI TOWER+ and is the answer not in the manual?

Questions and answers

Summary of Contents for POP UP MI TOWER+

  • Page 1 A S S E M B L Y G U I D E F OR MI TOWE R+ TOWER+ info@popupproducts.co.uk popupproducts.co.uk +44 (0)1244 833 933...
  • Page 2: Table Of Contents

    A S S E M B L Y G U I D E F OR MI TOWE R + CONTENTS CONTENTS GETTING STARTED 12-13 INTRODUCTION MI TOWER+ 2M - ASSEMBLY 14-15 KNOW YOUR MI TOWER+ MI TOWER+ 3M - ASSEMBLY 16-17 KNOW YOUR MI TOWER+’S COMPONENTS MI TOWER+ 4M - ASSEMBLY...
  • Page 3: Introduction

    INTRODUCTION M TOWER+ is a safe, versatile and high quality tower. It can be built by ONE PERSON and provides a work platform for up to TWO PEOPLE. It is designed in accordance with the latest testing and quality standards. Our priority is to help ensure the safe operation of our products, so please pay particular attention to the safety tips on pages and .
  • Page 4: Know Your Mi Tower

    KNOW YOUR MI TOWER+ PA R T S L I S T I N G 4 RUNG F RA M E A DJUSTA BLE LEG A ND CASTOR TOE BOA RD HATCH PL ATFOR M TE LESCOP I C STABI LIS ER GUA RDRAIL BRAC E PANEL Page 3...
  • Page 5: Know Your Mi Tower+'S Components

    KNOW YOUR MI TOWER+ COMPONENTS 1 GUARDRAIL BRACE PANEL jaw which is released by simply moving the jaw’s trigger. The claw must only be attached to the frame with the opening facing outward. Attachment with the jaw’s opening facing inward will not fully protect the user if lent upon and may cause serious injury or death.
  • Page 6 KNOW YOUR MI TOWER+ COMPONENTS Extend 7 ADJUSTABLE LEG AND CASTOR The adjustable leg and castor allows for accurate positioning of your MI TOWER in relation to your workplace. The leg can be Retract extended or retracted to allow for levelling and the brake must be Engagement applied to prevent movement.
  • Page 7: Know Your Kit List And Specifications

    KNOW YOUR KIT LIST AND SPECIFICATIONS COMPONENT MATRIX AND WEIGHTS GROUND CONDITIONS Weight (Unit) 4 RUNG FRAME 3.55 TELESCOPIC OUTRIGGER 4.35 HATCH PLATFORM 12.20 GUARDRAIL BRACE PANEL 4.15 220MM ADJUSTABLE LEG 0.85 125MM LOCKING CASTOR 2.45 TOE BOARD SET 6.50 MITOWER+ WEIGHT (KG) 126.05 153.65...
  • Page 8: Know Your Storage And Transport Pack

    KNOW YOUR STORAGE AND TRANSPORT PACK TRANSPORT AND STORAGE TROLLEY COMPONENTS For ease of storage and of transportation, GUARDRAIL BRACE PANEL X2 MI TOWER+ has been designed so that all TOE BOARD SET HATCH PLATFORM components can be safely stored within the ADJUSTABLE LEG AND CASTOR X4 tower’s base assembly.
  • Page 9: Safety Dos And Don'ts - Always

    SAFETY DOS AND DON’TS - ALWAYS Read and understand this guide before you begin assembly. ALWAYS Ensure that all safety requirements are met and that MI TOWER+ is the correct access solution ALWAYS for the task you wish to perform. ALWAYS Ensure that s assembled and d smantled b a ual fied competent person.
  • Page 10: Safety Dos And Don'ts - Never

    SAFETY DOS AND DON’TS - NEVER Use MI TOWER+ if you don’t understand something in this guide; please contact the supplier NEVER for advice. NEVER Assemble, use, move or dismantle MI TOWER+ if you are tired or unwell or if you are under the NEVER Use MI TOWER+ in adverse weather conditions which may endanger the user.
  • Page 11: Before You Start

    BEFORE YOU START PREPARATION The floor area must be clear of any obstructions including materials and debris. Check that you have all the components necessary to construct the tower height you require. Check also each component for condition and correct function. If any part is missing or damaged/not working correctly it must be replaced before assembling the tower.
  • Page 12: Getting Started

    GETTING STARTED GETTING STARTED MI TOWER+ requires only one person to assemble and dismantle it. Your MI TOWER+ is supplied with uniform 1m high 4 rung frames which can be used at any stage of the assembly. During erection, the frames may be connected together to create 2m high frames which makes assembly both quicker and easier.
  • Page 13: Mi Tower+ 2M - Assembly

    MI TOWER+ 2m - ASSEMBLY STEP 1 FROM TROLLEY For ease of storage and transportation your MiTOWER+ is designed so that all the components can be safely stored within the tower’s base. Start by removing the free-standing components from within the trolley and stack safely nearby for use.
  • Page 14 MI TOWER+ 2m - ASSEMBLY STEP 5 sure that the wind-lock catches engage. STEP 6 Fit a stabiliser to each corner of the tower. Position the lower horizontal stabiliser coupling clamp just above the frame’s second rung, then secure the top stabiliser coupling clamp just above the footprint as possible.
  • Page 15: Mi Tower+ 3M - Assembly

    MI TOWER+ 3m - ASSEMBLY STEP 1 REPLICATE STEPS 1 FROM 2M BUILD. Attach a guardrail brace panel to the vertical tube of one frame with the lo er cla pos t oned abo e the first rung and th all cla s fac ng outward.
  • Page 16 MI TOWER+ 3m - ASSEMBLY STEP 5 Place a set of conjoined frames one at each end of the tower ready to be fitted. Extend and lock the four component hangers located on component hanger on one side of the platform and a second platform on the other side.
  • Page 17: Mi Tower+ 4M - Assembly

    MI TOWER+ 4m - ASSEMBLY STEP 1 REPLICATE STEPS 1 TO 7 FROM 2M BUILD. STEP 2 Extend and lock the four component hangers located on either side of the platform. From the ground place three guardrail brace panels onto the hangers on one side of the platform and two sets of conjoined four rung frames on the other side.
  • Page 18 MITOWER+ 4m - ASSEMBLY STEP 7 With both guardrail brace panels in position, you may access the platform. Unfold the toe board set and position so that it sits on the outer edge of the platform. Finally, retract all hangers and the tower is now complete and ready to use.
  • Page 19: Mi Tower+ 5M - Assembly

    MI TOWER+ 5m - ASSEMBLY STEP 1 REPLICATE STEPS 1 TO 6 FROM 3M BUILD. end of the tower and apply the frame clips. Next, attach the guardrail brace panel with its lower jaw positioned above the seventeenth frame rung. Ensure all claws are facing outward and correctly locked on to the frame tube.
  • Page 20 MI TOWER+ 5m - ASSEMBLY STEP 7 With both guardrail brace panels in position, you may access the platform. Unfold the toe board set and position so that they sit on to the outer edge of the platform. Finally, retract all hangers and the tower is now complete and ready to use.
  • Page 21: Mi Tower+ 6M - Assembly

    MI TOWER+ 6m - ASSEMBLY STEP 1 REPLICATE STEPS 1 TO 6 FROM 4M BUILD. Descend the tower and from the ground place three guardrail brace of conjoined four rung frames on the other side. second platform. Repeat the process with the two sets of conjoined conjoined frames to each end of the tower and apply the frame clips.
  • Page 22 MI TOWER+ 6m - ASSEMBLY STEP 3 Access the tower until you are half way through the third platform’s trap door. Now manoeuvre yourself so that you are sitting on the platform, with your legs through the trap door and your feet on the frame rungs.
  • Page 23: 10 Point Pre-Use Safety Checklist

    10 POINT PRE-USE SAFETY CHECKLIST 10 POINT PRE-USE CHECKLIST FOR USERS BEFORE USE Completed tower must be checked by a competent person. COMPONENTS Check all components are free from damage. CASTORS Ensure they are locked. ENVIRONMENT Check your MiTOWER+ is level. STABILISER COUPLER CLAMPS Check they are secure.
  • Page 24: Registrations

    REGISTRATIONS Page 2...
  • Page 25 p opu p p ro duct s. co .uk +4 4 (0 )1 2 4 4 8 33 933 in f o@ po p u p p rod uc t s.c o. u k...

Table of Contents