Beam Assembly Installation; Cable Installation - piER plEASURE HYDRAULIC BOAT LIFT Owner's Manual & Assembly Manual

Hide thumbs Also See for HYDRAULIC BOAT LIFT:
Table of Contents

Advertisement

Hydraulic Beam Assembly Installation
Hydraulic beam assembly is attached to the canopy arms of the lift
with use of 3/8" bolts and brass nuts. If you do not have a canopy,
short inner legs are available to attach the beam assembly. The
hydraulic beam assembly is very heavy and will require additional
help to lift into place. Place beam into position and install canopy
arms or short inner legs. Tighten all bolts for canopy arms and
hydraulic beam.

Cable Installation

The cable from the hydraulic beam assembly is installed though the bunk beam. There are two
sheaves located in the bunk beam that will have be removed and reinstalled into the beam. If you are
adding this hydraulic system to an exisiting boat lift with a winch cable, that cable will also have to be
removed. Slide the cable from the hydraulic beam through the beam re-install the sheaves. The
threaded rod on the end of the cable is placed through the hole in the flat bar on the opposite side.
Place two brass nuts on the threads to properly secure the cable.
CABLE INSTALLED THROUGH BUNK
BEAM AND BACK UP TO OTHER
SIDE. (SEE PHOTO BELOW)
CABLE INSTALLED THROUGH BUNK
BEAM AND SECURED INTO THE FLAT
ON THE UPRIGHT OPPOSITE OF
HYDRAULIC BEAM. USE 2 NUTS TO
SECURE THE CABLE.
Use 3/8" bolts and brass nuts to
secure beam around canopy arm.
CANOPY ARM
OR SHORT
INNER LEG
FRONT BUNK
BEAM
- 4 -
HOSES TO PUMP
CANOPY ARM
OR SHORT
INNER LEG
SIDE VIEW

Advertisement

Table of Contents
loading

Table of Contents