Tubing Connections - Rheem RA17 Series Installation Instructions Manual

Air cooled condensing units
Table of Contents

Advertisement

Interconnecting Tubing (cont.)
• If tubing is to be run underground, it must be run
in a sealed watertight chase.
• Use care in routing tubing and do not in or
twist. Use a good tubing bender on the vapor
line to prevent kinking.
TEMPORARY
HANGER
• oute the tubing using temporary hangers then
straighten the tubing and install permanent
hangers. Line must be adequately supported.
• If the vapor line comes in contact with inside
walls, ceiling, or flooring, the vibration of the
vapor line in the heating mode will result in noise
inside the structure.
• low out the liquid and vapor lines with dry
nitrogen before connecting to the outdoor unit
and indoor coil. Any debris in the line set will end
up plugging the expansion device.

Tubing Connections

Indoor coils have only a holding charge of
dry nitrogen. Keep all tube ends sealed until
connections are to be made.
• Use type
copper refrigeration tubing. ra e
the connections with the following alloys:
– copper to copper, 5% silver minimum
– copper to steel or brass, 15% silver minimum
PERMANENT
HANGER
• e certain both refrigerant shutoff valves at the
outdoor unit are closed.
• Remove the caps and Schrader cores from the
pressure ports to protect seals from heat damage.
Both the Schrader valves and the service valves
have seals that may be damaged by excessive heat.
ST-A1226-05-00
• Clean the inside of the fittings and outside of the
tubing with a clean, dry cloth before soldering.
Clean out debris, chips, dirt, etc., that enters tubing
or service valve connections.
• Wrap valves with a wet rag or thermal barrier
compound before applying heat.
INSTALLATION
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ra1724aj2cbRa1736aj2cbRa1748aj2cbRa1760aj2cb

Table of Contents