Download Print this page

Xylem YSI DB600 Quick Start Manual page 3

Buoy

Advertisement

Connect the mooring system
3
Connect the mooring chain using the D-Shackle
included (Figure 4).
The free end of the rope is to connect to the us-
er-supplied anchor or mooring block. Take care
to ensure a suitably-sized anchor is used for the
local conditions.
When handling the mooring chain, rope,
or wire, gloves should be worn to prevent
injuries to hands.
Connect sensor and deploy
4
Use O-ring grease to lubricate and protect pins
and connect sensor cable to the instrument and
the connector on the bottom of the Ai1 (Figure 5).
Deploy the sonde in the instrument tube,
ensuring the sonde is operating and configured.
Record the parameter names and units for
configuration in HydroSphere.
Use caution to prevent pinching or other
injuries to hands.
3
Figure 4: Connect the mooring chain to the instrument tube and
(user supplied) anchor.
Figure 5: Connect the sensor cable to the instrument and the con-
nector on the bottom of the Ai1.

Advertisement

loading