Download Print this page
Xylem YSI DB600 Quick Start Manual
Xylem YSI DB600 Quick Start Manual

Xylem YSI DB600 Quick Start Manual

Buoy

Advertisement

Quick Links

DB600 Buoy
QUICK START GUIDE
The DB600 Quick Start Guide is intended to provide you with the basic steps needed to set up your buoy after unpacking
it. This Guide will walk you through the steps of physically assembling your buoy, affixing the All-in-One (Ai1) Logging &
Communications system, attaching the mooring, connecting your sonde, and finally connecting via HydroSphere (where
applicable). Before starting any of these steps, please visually inspect your system for any damage that may have occurred
during shipment.
Items Required During Assembly
Saftey Goggles
Work Gloves
Standard Flat & Phillips Head Screw Drivers
Metric Wrenches: 10 mm, 13 mm, 16 mm
Ai1 Telemetry
Station
Deployment Tube
(houses sonde)
Mooring line
connection point
Figure 1: Diagram explaining the components of the DB600 Buoy
Metric Allen Wrenches: 5 mm, 6 mm, 8 mm
O-Ring Grease
Customer supplied padlock
4 x M6 holes on top
to mount lantern
Top bracket
Bottom
bracket
Locking pin
Quick Start Guide
YSI Systems
XA00101

Advertisement

loading

Summary of Contents for Xylem YSI DB600

  • Page 1 Quick Start Guide YSI Systems XA00101 • DB600 Buoy QUICK START GUIDE The DB600 Quick Start Guide is intended to provide you with the basic steps needed to set up your buoy after unpacking it. This Guide will walk you through the steps of physically assembling your buoy, affixing the All-in-One (Ai1) Logging & Communications system, attaching the mooring, connecting your sonde, and finally connecting via HydroSphere (where applicable).
  • Page 2 The DB600 requires the following basic assembly steps before deployment. A more customized system may require additional steps; refer to the DB600 User’s Manual as needed. Install Deployment Tube • The deployment tube fits down through the top of the buoy. Note the orientation of the side bracket that prevents rotation of the tube in the DB600.
  • Page 3 Connect the mooring system • Connect the mooring chain using the D-Shackle included (Figure 4). • The free end of the rope is to connect to the us- er-supplied anchor or mooring block. Take care to ensure a suitably-sized anchor is used for the local conditions.
  • Page 4 For additional information please refer to your HydroSphere Manual. Figure 7: YSI HydroSphere provides secure, real-time monitoring. YSI, a Xylem brand +1.727.565.2201 7100 Business Park Drive, Suite B info@ysi.com Houston, TX 77041 YSI.com YSI.com/DB600 © 2020 Xylem, Inc. XA00101 0620...